Solar panels for business: the SEAI grant
The SEAI Non-Domestic Microgen scheme pays towards solar PV for businesses, farms and public bodies, up to €325,200 for a 1 MWp system. The SEAI doubled the rates for applications made from 6 October 2026 to 6 July 2027. The grant is only half the question. The other half is sizing the system to the power you actually use.
By Rachel McKeogh, Operations Support Manager at VisionGreen. Updated .
How much the grant is
SEAI rates for new applications made from 6 October 2026 to 6 July 2027. The grant is paid at the lower of the offer or 45 per cent of the invoiced cost.
- 1 kWp: €1,800
- 2 kWp: €3,600
- 3 kWp: €4,200
- 4 to 6 kWp: €4,800
- 7 to 20 kWp: €600 per kWp
- 21 to 200 kWp: €400 per kWp
- 201 to 1,000 kWp: €300 per kWp
- Above 1,000 kWp: no extra support, the maximum is €325,200
Worked examples
- 20 kWp: €13,200
- 50 kWp: €25,200
- 100 kWp: €45,200
- 200 kWp: €85,200
- 500 kWp: €175,200
Who qualifies
- Businesses, farms, public bodies and non-profits
- Premises built and occupied on or before 31 December 2020
- The system must be for self-consumption on a site that uses the power, not export only
- SEAI grant approval must be in place before you buy anything or start work
- The installer must be on the SEAI's registered lists, with a Safe Electric registered electrician
- One grant per electricity meter (MPRN). The offer is valid for eight months
Size it from your real demand
Solar pays back fastest when the site uses most of what it generates. A hotel or food business with steady daytime refrigeration and kitchen load is a good fit. Measuring your daytime baseline before you size the system avoids paying for panels whose output you export for little return.
Solar panels for business: is it worth it?
Solar panels for business pay back best where the building uses a lot of electricity in daylight hours, such as hotels, food plants, cold stores and retail, because most of the output is used on site rather than exported. Business grants for solar panels from the SEAI make a large difference to the payback, but only if approval is in place before you order.
VisionGreen sizes commercial solar panels in Ireland from your measured daytime load, handles the SEAI commercial solar grant application and manages the installation.
Sources
- SEAI, Non-Domestic Microgen Grant Application Guide, version 1.4
Common questions
How much is the SEAI solar grant for a business?
It depends on system size. For applications made before 6 July 2027 it is €400 per kWp from 21 to 200 kWp and €300 per kWp from 201 to 1,000 kWp, with higher rates for small systems, capped at 45 per cent of the cost. A 100 kWp system receives up to €45,200, and the maximum is €325,200.
Can I install the panels and claim the grant afterwards?
No. SEAI grant approval must be in place before any materials are bought or work starts.
Is commercial solar worth it in Ireland?
It usually is for businesses with steady daytime demand, especially with the grant. The payback depends on how much of the output you use on site, which is why measuring your daytime load first matters.
Want this applied to your building?
Start with an energy audit. If you spend over ten thousand euro a year on energy, the SEAI grant covers most of the cost.