Compressed air
The most expensive utility in most plants and the one that leaks quietly. Metering the compressor shows what the leak rate is costing every weekend.

A plant's energy bill is really a dozen bills: compressed air, process heat, motors, extraction, lighting and the load that never switches off. We separate them.
The most expensive utility in most plants and the one that leaks quietly. Metering the compressor shows what the leak rate is costing every weekend.
Ovens, dryers and boilers holding temperature through breaks and shift changes because nobody set a schedule.
Fixed-speed motors running at full draw on part load. The data tells you which ones justify a drive.
Fans running to a clock rather than to demand, often long after the line stops.


For a finance director, this is the clearest case we make. Manufacturing load is measurable, repeatable and large enough that a percentage point is real money.
The same three parts, whatever the building.
HardwareEniscope meters on the circuits that matter, reading every minute. Installed in a few hours, no shutdown.
SoftwareA cloud dashboard showing use by asset, site and hour, with alerts when something changes.
Our teamEnergy management from people who read the data every month and tell you what to do about it.VisionGreen works with Irish manufacturers and food and drink plants: line-by-line energy monitoring, SEAI-funded and mandatory energy audits, and EXEED-funded upgrade projects, with the savings verified on the same meters.
VisionGreen meters compressors and large motors, measures the leak rate and the load they carry, then specifies the fixes: leak repair, pressure reduction, compressor control and variable-speed drives. Our compressed air guide covers what to look for.
VisionGreen builds energy-led decarbonisation plans from measured data: where the energy and emissions come from, which projects cut them, what each costs and which SEAI or Enterprise Ireland support funds it. Enterprise Ireland clients can use Access Advice: GreenStart towards the plan, and the Environmental Aid Fund for the capital projects.
Yes. Plants under 2.8 GWh a year can use the €2,000 energy audit voucher, and larger designed projects can use EXEED, which funds up to 50% of design costs and up to 30% of capital costs (40% for heat pumps).
If you spend over €10,000 a year on energy, the Support Scheme for Energy Audits covers most of the cost. An engineer walks the site and writes up what to fix and what it returns.