EXEED (Excellence in Energy Efficient Design) is the SEAI grant for larger, more complex energy projects. It pays towards the design work as well as the build, which no other SEAI business scheme does.

By Rachel McKeogh, Operations Support Manager at VisionGreen. Updated .

What EXEED pays

Grant funding of up to €3 million per project is available across two stages, and you can apply for either stage on its own. Support above €3 million can be considered with pre-approval from the Department of Climate, Energy and the Environment.

  • Stage 1, pre-investment: up to 50% of studies, feasibility, design and professional services for EXEED projects, and up to 30% for other impactful projects
  • Stage 2, capital: up to 30% of eligible capital costs for most measures, and up to 40% for heat pumps
  • SME uplift: an extra 10 to 20% at stage 2, but only for projects with a payback over 10 years before grant

Who qualifies

Non-domestic organisations: businesses, public bodies, not-for-profits and other non-domestic organisations, for projects on their buildings and processes.

The asset must have an annual final energy consumption of at least 100,000 kWh. That rules out small sites, and is why EXEED suits food and drink plants, pharma and medtech sites, hotels with leisure centres, cold stores and large commercial buildings.

What makes a project EXEED

EXEED Certified is an asset certification programme based on I.S. 399:2014, the Irish standard for energy efficient design management. It brings energy expertise into the design stage of a new or modified asset, when changes are cheapest and the savings are largest.

Projects that follow the EXEED design process get the higher stage 1 rate. Impactful projects that do not follow it can still be funded, at the lower rate.

How the application works

The scheme is open all year. Applications are made online by the organisation seeking the grant, and each project is scored: it needs at least 65 out of 100 across impact, value for money and the quality of the project team and process.

SEAI expects to evaluate stage 1 applications within about 3 weeks and stage 2 within 8 to 12 weeks, plus about 4 weeks for grant requests over €1 million. Projects typically complete within 24 months.

The rules that catch people out

  • Nothing committed before the letter of offer is eligible: no orders, no works, no payments
  • Where you would have bought new equipment anyway, a counterfactual cost is deducted, so the grant covers the extra cost of the efficient option
  • For lighting, only a full system redesign is eligible; replacing lamps alone is not
  • Commissioning certificates, product datasheets and O&M manuals are needed to claim the grant

How VisionGreen helps

We carry out the energy analysis the design stage needs, from measured data rather than estimates, help build the application and the counterfactual, and stay on through delivery to measure and verify the savings. EXEED has funded 426 investments since 2017, so SEAI knows what a strong application looks like, and so do we.

Sources

Where VisionGreen can help

Common questions

How does the SEAI EXEED grant work for businesses?

EXEED funds larger energy projects in two stages: up to 50% of the design and professional services (stage 1), then up to 30% of the capital cost, or 40% for heat pumps (stage 2), up to €3 million per project. The asset must use at least 100,000 kWh a year, and nothing can be committed before SEAI issues a letter of offer.

Who qualifies for the EXEED grant?

Businesses, public bodies, not-for-profits and other non-domestic organisations with an asset using at least 100,000 kWh of energy a year.

Who helps businesses with the SEAI EXEED grant application?

VisionGreen helps Irish businesses with EXEED applications: we provide the energy analysis and measured baseline, help prepare the application and counterfactual, and verify the savings after delivery.

What is the difference between EXEED and the Business Energy Upgrade Scheme?

The Business Energy Upgrade Scheme is a fast-approval grant for standard measures such as heat pumps, insulation and BMS, with a fixed cap per measure. EXEED is for larger, bespoke projects, is scored individually, and funds the design work as well as the build.

How long does EXEED approval take?

SEAI expects stage 1 decisions within about 3 weeks of a complete application, and stage 2 within 8 to 12 weeks, plus about 4 weeks for requests over €1 million.

Can EXEED fund LED lighting?

Only a full lighting redesign. Replacing lamps on their own is not eligible.

Want this applied to your building?

Start with an energy audit. If you spend over ten thousand euro a year on energy, the SEAI grant covers most of the cost.

Call usEnquire